Description

This was a renovation of a 3 story exclusive apartment in Surry Hills. Work here included removal of 2 existing bathrooms and a kitchen, as well as all the fittings and fixtures.

A partition wall construction and fit out of the 2 architecturally designed bathrooms and a new open plan kitchen were then commenced. Rectification of old polished concrete floors and timber floors. There was a re-sand and polish applied to all areas and a new interior paint scheme.

This was a tricky job as it had very limited access and had high quality finishes to all areas of access, which required protection. This included the need to crane the bath in through the second story window to gain access. Total project time was 3 months.